How to make a tennis court
Basic Info
On a tennis court, the height of the posts shall not exceed 2.5 centimeters (1 inch) above the top of the rope, with the center of the post 0.914 meters (3 feet) from the outer edge of the sideline, and the height of the post shall be such that the top of the net or rope is 1.07 meters (3 feet 6 inches) above the ground.
Generally speaking, tennis enthusiasts have the impression that a tennis court construction is an open space, surrounded by a wire fence, framed internet in the center, painted online and better yet also painted, is a tennis court. But in fact, even the construction of a very common hard plastic court should follow complex and strict steps, and its design and construction process is completed by a professional Tennis court construction company. The next step is explained by the editorial staff of Oshang Industrial!
Customized high quality tennis court
Step 1:Tennis court planning and site selection
Before building any project, the first step is to make a detailed plan. If you want to build a tennis court, the first question you must consider is what kind of surface should the tennis court surface take? Is it a soil surface or a modern synthetic plastic pellet surface? There are advantages and disadvantages to both types, but synthetic surfaces zui have improved recently and their advantages have become clear. Currently acrylic plastic surfaces have been widely used applications.
Second, choose to determine the address of the tennis court, and according to the surrounding environment to plan a reasonable construction program. The main factors include: site soil conditions, permafrost thickness, groundwater location, site direction, cement or asphalt foundation selection, the size of the space interval when multiple sites are connected. The construction of the tennis court should take measures according to the local conditions, but at least occupy a site of 19 x 37m.
Step 2:Tennis court infrastructure construction
After the planning and design program, the foundation construction should be started. The quality of the tennis court depends largely on the quality of its infrastructure. Therefore, the foundation construction must choose a professional foundation construction team, strictly follow the requirements of the site foundation, and strictly follow the construction standards for inspection. The specific requirements of the site foundation are: cement foundation, that is, reinforced concrete foundation. It has to be laid successfully with commercial concrete at one time. Reinforcement is added to increase the integrity of the site and prevent the foundation from cracking. Generally an indentation joint is to be left directly below the ball net in the center of each court. The asphalt foundation is excavated from the ground down to the corresponding depth according to the local environmental conditions, filled with different materials in turn, and gradually rolled so that its denseness is not less than 2.35 tons/cubic meter. Its surface asphalt should have no sesame, honeycomb, no oil pollution, and no oil return in summer high temperature.
Cement foundation and asphalt foundation surface flatness difference is not greater than 2mm, that is, with 2m ruler to measure and check the site, the average error is not greater than 2mm. for outdoor stadiums, it should be along the direction of the ball net 5 ‰ in order to make the pitch on both sides of the natural drainage, the left and right slopes.
In addition, in the process of foundation construction, it is necessary to prepare in advance for the pre-burial of some ancillary facilities fixings, so as to avoid leakage and damage to the integrity of the foundation in the process of redoing in the future.
Step 3: Construction of ancillary facilities such as retaining net, tennis wall and lighting system around the tennis court
Once the infrastructure is completed, based on some of the previous pre-embedded facilities, install the retaining nets and light poles around the stadium and arrange the tennis walls for practicing as much as possible.
Step 4: Laying the tennis court ground layer
1. Cleaning and repairing of the foundation site:Repair some potholes and depressions, and then clean or wash the whole site. It should be noted that the repaired site must be dry (usually 24 hours) before continuing the construction.
2、Laying adhesive layer:Lay a layer of adhesive on the surface of cement foundation, which can be tightly bonded with the cement surface and tightly bonded with the surface plastic material to prevent deglossing, peeling and other problems.
3. Laying foundation enhancement layer: In order to improve the strength, flatness and service life of the site, the main raw materials of plastic surface acrylic acid, quartz sand and water are mixed into emulsion in a certain proportion and evenly laid on the site.
4. Paving filler layer: Use acrylic color layer base material to add appropriate quartz sand mixing and paving. Mixed quartz sand not only has abrasion resistance, but also can be adjusted and control the ball speed according to the dosage.
5. Surface oil paving:Mainly made of acrylic surface oil mixed with a certain proportion of water, evenly paved on the filler layer. Bright color, anti-UV fade, wear-resistant.
Step 5: Tennis court drawing lines, hanging nets
After laying the surface oil, need plastic surface layer zui last step of the process - painting line. Drawing lines should be noted that, in strict accordance with the standard size pre-drawn two small fine lines, and double-checked. After double-checking, use adhesive stickers to stick on the outside of the two small fine lines, and then use a special site to paint the line paint. Then tear off the adhesive stickers, install the net posts, and hang the tennis net and center pull straps. So far, after the above five steps, even if built an ordinary plastic tennis court.
Finally, regular maintenance and upkeep of the tennis court is also key to keeping costs down. Ensure that damaged facilities are repaired and replaced on a regular basis to avoid further losses and costs. Additionally, clean and maintain the court on a regular basis to prolong its life and reduce maintenance costs. In conclusion, building an inexpensive tennis court requires careful planning and decision making. Choosing the right court and materials, negotiating with suppliers, and regularly maintaining and servicing the facility are all key to achieving cost-effectiveness. By taking these steps, you can build an affordable tennis court without sacrificing quality.